Amazon cover image
Image from Amazon.com

Project scheduling with time windows and scarce resources: temporal and resource-constrained project scheduling with regular nonregular objective functions

By: Contributor(s): Material type: TextTextSeries: Lecture Notes in Economics and Mathematical Systems, no.508Publication details: Berlin Springer-Verlag 2002 Description: xi, 335 pISBN:
  • 9783540424635
Subject(s): DDC classification:
  • 658.5
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Item location Shelving location Call number Status Date due Barcode
Books Vikram Sarabhai Library Rack 39-A / Slot 2184 (2nd Floor, East Wing) General Stacks 658.5 N3P7 (Browse shelf(Opens below)) Available 150677

There are no comments on this title.

to post a comment.