Interaction between production scheduling and dispatching: an experimental study in an MRP frame work (Thesis)
Material type:
- TH 1987/05
Item type | Current library | Item location | Collection | Shelving location | Call number | Copy number | Status | Date due | Barcode | |
---|---|---|---|---|---|---|---|---|---|---|
Thesis (FPM) | Vikram Sarabhai Library | Slot 2462 (3 Floor, East Wing) | Reference | TH 1987/05 (Browse shelf(Opens below)) | 2 | Processing Center (Restricted Access) | 113732 | |||
Thesis (FPM) | Vikram Sarabhai Library | Rack 48-B / Slot 2672 (3rd Floor, East Wing) | Reference | Thesis | TH 1987/05 (Browse shelf(Opens below)) | 3 | Not for Issue (Restricted Access) | 138180 | ||
Thesis (FPM) | Vikram Sarabhai Library | KLMDC | Reference | Reference | TH 1987/05 (Browse shelf(Opens below)) | 1 | Processing Center (Restricted Access) | 113731 |
Satia, J. K. (Guide) Thesis advisory committee: Prof. J. K. Satia (Chairman), Prof. M. G. Korgaonker, Prof. J.K. Satia and Porf P. R. Shukla
There are no comments on this title.
Log in to your account to post a comment.