Decision support system for production scheduling at the Kandla plant of IFFCO by Ashish Bamba and Purnajit Chatterjee (Student Project)

By: Contributor(s): Material type: TextTextPublication details: Ahmedabad 1988 Indian Institute of ManagementSubject(s): DDC classification:
  • SP 1988/127
Summary: The problem of production scheduling at the Kandla plant of IFFCO was studied. A decision support system was developed to determined which grade to produce at a given time and to produce it for how long a time period. DSS developed was aimed to satisfy ECA allocation (demand constraints), storage constraints etc.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Shelving location Call number Status Date due Barcode
Student Project Vikram Sarabhai Library Reference Students Project SP 1988/127 (Browse shelf(Opens below)) Not for loan SP000127

Submitted to Prof. S.C. Bhatnagar

The problem of production scheduling at the Kandla plant of IFFCO was studied. A decision support system was developed to determined which grade to produce at a given time and to produce it for how long a time period. DSS developed was aimed to satisfy ECA allocation (demand constraints), storage constraints etc.

There are no comments on this title.

to post a comment.